| Timeline | Tour | Cleanup | Electrical | Exterior / Garage | | Front Bed | Guest Bed | Master Bed | Master Bath | | Hall Bath | Hallway | Living room/Den | Kitchen | |
![]() built-ins |
![]() window to drybar |
||||
![]() kitchen counter - behind built-ins |
![]() kitchen |
![]() fridge space, drybar door to R |
|||
![]() utility room and drybar |
![]() utility room |
![]() pantry, opposite washer, water heater closet to L |
![]() |
![]() |
![]() utility room |
![]() with much larger pantry |
![]() built-ins gone |
![]() new stove |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() temporary kitchen in hall bath |
![]() |
![]() 2-18: demo finished |
![]() corner of kitchen |
![]() ceiling removed |
![]() 2-21: tankless water heater in attic |
![]() 2-22: new door to garage |
![]() March 18-22, 2012: |
![]() new sink/washer plumbing, dryer vent |
![]() |
![]() |
![]() ![]() March 28, 2012: ready for insulation |
|
March 29, 2012: foam insulation![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() 4-4-12: can lights |
![]() 4-4-12: ceiling |
![]() 4-4-12: OSB on walls |
![]() 4-6-12: utility room/pantry walls |
![]() ![]() 4-6-12: kitchen drywall finished |
|
![]() 4-17-12: drywall ready for texturing |
![]() 4-20-12: textured |
![]() 4-25-12: |
![]() pantry lights |
![]() 4-25-12: |
![]() pantry floor tiled |
![]() 4-26-12: washer & dryer in place |
![]() temporary pantry |
![]() kitchen ready for painting |
![]() 5-5-12: kitchen painted |
![]() 5-16-12: door painted |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() The final piece |
![]() |
![]() |
![]() June 13, 2012: |
![]() pocket door installed |
![]() June 21, 2012: |
![]() door stops & threshold |
![]() |
![]() Aug 4: ready for install |
Aug 5, 2015 | |
![]() |
![]() (utility room) |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() | |
![]() They did not install the |
![]() peninsula correctly at first. |
![]() Fixed it. |
![]() But the pony wall is missing. |
![]() The end cabinets are supposed to be white inside. And they didn't make doors for the center cabinet... |
![]() Cabinets over washer/dryer. |
![]() These open cabinets are also supposed to be white inside. |
|
![]() And the bottom of this is supposed to be a white board flush with the bottom edge of the cabinet doors. |
Aug 22, 2015 | |
![]() Bottom of cabinet fixed. |
![]() Pony wall fixed. |
![]() Trash (recycle) bins added. |
![]() Flip trays installed. |
![]() Aug 26: Shelves (still missing shelf for pantry cabinet and ALL of the white shelves.) |
![]() ![]() Sept 2: FINALLY got the open cabinets sprayed white. |
![]() ![]() ![]() |
![]() |
Sept 6-7: re-installed floor![]() |
![]() |
![]() October 2015: temporary sink reinstalled (new dishwasher not connected) |
![]() November 2015: over-range microwave installed |
![]() But still needs the vent pipe put in... which Darrell came back and finished later. ![]() |
![]() ![]() December 31, 2015: pantry shelves installed |
![]() ![]() Found an awesome slab of "black pearl" granite at Granite Huggers in Sanger. (My fireplace hearth is a small piece of "blue pearl", for comparison.) |
![]() Had to take down the pantry shelves for the counter install. |
![]() |
![]() |
![]() |
![]() |
![]() 5-24-17: particleboard covered with repurposed wood paneling from den remodel |
![]() 5-27-17: adhesive sheets in place (instead of using mortar) |
![]() 5-28-17: LED lights under cabinets |
![]() ![]() 5-31-17 |
|
![]() 6-2-17: top tiles grouted |
![]() 6-3-17: window tiles all grouted |
![]() 6-4-17 |
![]() 6-4-17 |
![]() 6-6-17 |
![]() 6-6-17 |
![]() 6-7-17: all grouted |
![]() |
BACK to my House Project Page
| Home |
| Personal |
Tess |
TV Shows |
Lord of the Rings |
Pern |
| Art |
House |
Library |
MLP |
Pets |
Friends |
Vacations |
| Timeline |
Tour |
Cleanup |
Electrical |
Exterior / Garage |
| Front Bed |
Guest Bed |
Master Bed |
Master Bath |
| Hall Bath |
Hallway |
Living room/Den |
Kitchen |
Check out my Sitemap for more 'updates' info. | Last updated: August 13, 2023 |