| Timeline | Tour | Cleanup | Electrical | Exterior / Garage | | Front Bed | Guest Bed | Master Bed | Master Bath | | Hall Bath | Hallway | Living room/Den | Kitchen | |
built-ins |
window to drybar |
||||
kitchen counter - behind built-ins |
kitchen |
fridge space, drybar door to R |
|||
utility room and drybar |
utility room |
pantry, opposite washer, water heater closet to L |
utility room |
with much larger pantry |
built-ins gone |
new stove |
temporary kitchen in hall bath |
2-18: demo finished |
|
corner of kitchen |
ceiling removed |
2-21: tankless water heater in attic |
2-22: new door to garage |
March 18-22, 2012: |
new sink/washer plumbing, dryer vent |
March 28, 2012: ready for insulation |
|
March 29, 2012: foam insulation |
|
4-4-12: can lights |
4-4-12: ceiling |
4-4-12: OSB on walls |
4-6-12: utility room/pantry walls |
4-6-12: kitchen drywall finished |
|
4-17-12: drywall ready for texturing |
4-20-12: textured |
4-25-12: |
pantry lights |
4-25-12: |
pantry floor tiled |
4-26-12: washer & dryer in place |
temporary pantry |
kitchen ready for painting |
5-5-12: kitchen painted |
5-16-12: door painted |
The final piece |
|
June 13, 2012: |
pocket door installed |
June 21, 2012: |
door stops & threshold |
Aug 4: ready for install |
Aug 5, 2015 | |
(utility room) |
|
They did not install the |
peninsula correctly at first. |
Fixed it. |
But the pony wall is missing. |
The end cabinets are supposed to be white inside. And they didn't make doors for the center cabinet... |
Cabinets over washer/dryer. |
These open cabinets are also supposed to be white inside. |
|
And the bottom of this is supposed to be a white board flush with the bottom edge of the cabinet doors. |
Aug 22, 2015 | |
Bottom of cabinet fixed. |
Pony wall fixed. |
Trash (recycle) bins added. |
Flip trays installed. |
Aug 26: Shelves (still missing shelf for pantry cabinet and ALL of the white shelves.) |
Sept 2: FINALLY got the open cabinets sprayed white. |
Sept 6-7: re-installed floor |
|
October 2015: temporary sink reinstalled (new dishwasher not connected) |
November 2015: over-range microwave installed |
But still needs the vent pipe put in... which Darrell came back and finished later. |
December 31, 2015: pantry shelves installed |
Found an awesome slab of "black pearl" granite at Granite Huggers in Sanger. (My fireplace hearth is a small piece of "blue pearl", for comparison.) |
Had to take down the pantry shelves for the counter install. |
5-24-17: particleboard covered with repurposed wood paneling from den remodel |
5-27-17: adhesive sheets in place (instead of using mortar) |
5-28-17: LED lights under cabinets |
5-31-17 |
|
6-2-17: top tiles grouted |
6-3-17: window tiles all grouted |
6-4-17 |
6-4-17 |
6-6-17 |
6-6-17 |
6-7-17: all grouted |
BACK to my House Project Page
| Home |
| Personal |
Tess |
TV Shows |
Lord of the Rings |
Pern |
| Art |
House |
Library |
MLP |
Pets |
Friends |
Vacations |
| Timeline |
Tour |
Cleanup |
Electrical |
Exterior / Garage |
| Front Bed |
Guest Bed |
Master Bed |
Master Bath |
| Hall Bath |
Hallway |
Living room/Den |
Kitchen |
Check out my Sitemap for more 'updates' info. | Last updated: August 13, 2023 |