Original kitchen:



built-ins

window to drybar

kitchen counter - behind built-ins

kitchen

fridge space, drybar door to R

utility room and drybar

utility room

pantry, opposite washer, water heater closet to L


Completed kitchen:



utility room

with much larger pantry



mid-November, 2008:
Removal of built-ins between kitchen and den.



built-ins gone



February, 2009:
"New" stove from Darrell's project.



new stove



May 28, 2011:
Removal of more built-ins, counter.





January 2012:
Removed rest of cabinets/counters/drywall



temporary kitchen in hall bath




2-18: demo finished

corner of kitchen

ceiling removed


2-21: tankless water heater in attic

2-22: new door to garage




March 18-22, 2012:

new sink/washer plumbing, dryer vent


March 28, 2012: ready for insulation
March 29, 2012: foam insulation


4-4-12: can lights

4-4-12: ceiling

4-4-12: OSB on walls

4-6-12: utility room/pantry walls

4-6-12: kitchen drywall finished

4-17-12: drywall ready for texturing

4-20-12: textured


4-25-12:

pantry lights

4-25-12:

pantry floor tiled

4-26-12: washer & dryer in place

temporary pantry

kitchen ready for painting

5-5-12: kitchen painted

5-16-12: door painted



June 13, 2012:
Installing bamboo floor



 

The final piece




June 13, 2012:

pocket door installed

June 21, 2012:

door stops & threshold



August 2015:
kitchen (& utility room) cabinets



 

Aug 4: ready for install

Aug 5, 2015

(utility room)

They did not install the

peninsula correctly at first.

Fixed it.

But the pony wall is missing.

The end cabinets are supposed to be white inside.
And they didn't make doors for the center cabinet...

Cabinets over washer/dryer.

These open cabinets are also supposed to be white inside.

And the bottom of this is supposed to be a white board
flush with the bottom edge of the cabinet doors.

Aug 22, 2015

Bottom of cabinet fixed.

Pony wall fixed.

Trash (recycle) bins added.

Flip trays installed.


Aug 26: Shelves
(still missing shelf for pantry cabinet and ALL of the white shelves.)



September 2015:




Sept 2: FINALLY got the open cabinets sprayed white.
  

Sept 6-7: re-installed floor





October 2015: temporary sink reinstalled
(new dishwasher not connected)


November 2015:
over-range microwave installed

But still needs the vent pipe put in...
which Darrell came back and finished later.

 
December 31, 2015: pantry shelves installed



August 10, 2016: granite countertops installed


 
Found an awesome slab of "black pearl" granite at Granite Huggers in Sanger.
(My fireplace hearth is a small piece of "blue pearl", for comparison.)

Had to take down the pantry shelves for the counter install.



May-June, 2017: Tile backsplash



5-24-17: particleboard covered with repurposed wood paneling from den remodel

5-27-17: adhesive sheets in place (instead of using mortar)

5-28-17: LED lights under cabinets
 
5-31-17

6-2-17: top tiles grouted

6-3-17: window tiles all grouted

6-4-17

6-4-17

6-6-17

6-6-17

6-7-17: all grouted



June 14, 2017: new refrigerator



BACK to my House Project Page

| Home |
| Personal | Tess | TV Shows | Lord of the Rings | Pern |
| Art | House | Library | MLP | Pets | Friends | Vacations |

| Timeline | Tour | Cleanup | Electrical | Exterior / Garage |
| Front Bed | Guest Bed | Master Bed | Master Bath |
| Hall Bath | Hallway | Living room/Den | Kitchen |

Check out my Sitemap for more 'updates' info. Last updated: August 13, 2023